Shams Tower

Built In BIM was engaged to deliver comprehensive BIM services for Shams Tower, a high-rise development in the UAE. The project required end-to-end Building Information Modeling support across architectural, structural, and MEPF disciplines. From the early design phase to the issued-for-construction (IFC) stage, our team ensured every element was accurately modeled and fully coordinated in compliance with UAE’s construction standards. We provided a clash-free, construction-ready BIM package, facilitating smooth execution on-site and minimizing rework.

  • Discipline: Architectural, Structural, MEPF
  • Location: UAE
  • Scope of Work: Concept Design to Issued for Construction (IFC) Stage

Problem

The Shams Tower project presented several challenges typical of large-scale, multidisciplinary developments:

Fragmented Design Coordination:

Multiple design consultants working in silos led to conflicts in design intent across disciplines.

Tight Project Timeline:

The developer required a fast-tracked design-to-construction workflow to meet investment and occupancy goals.

Complex MEPF Systems:

Given the building’s vertical scale, achieving precise integration of mechanical, electrical, plumbing, and fire systems with architecture and structure was critical.

Regulatory Compliance:

Adhering to UAE-specific BIM standards and documentation protocols added complexity to project delivery.

Solution

Built In BIM approached the project with a holistic BIM strategy:

01

Integrated 3D Modeling:

Our team developed detailed and discipline-specific models in Autodesk Revit, ensuring real-time coordination across architectural, structural, and MEPF trades.

02

Clash Detection & Resolution:

Using Navisworks, we conducted iterative clash detection sessions, resolving over 500+ issues during design coordination and ensuring a clash-free model before IFC submission.

03

UAE Standards Compliance:

All deliverables, including 3D models, 2D documentation, and IFC files, were aligned with local regulatory requirements and client-specific BIM Execution Plan (BEP).

04

Collaborative Workflows:

Leveraging cloud-based platforms like BIM 360, we enabled seamless collaboration between stakeholders across time zones.

05

Efficient Delivery:

The final output was a fully coordinated, constructible model with accurate BOQs and IFC drawings, significantly reducing site delays and construction costs.

Gallery

Outcome :

The Shams Tower project was delivered on time with zero critical clashes, reduced design-to-construction turnaround, and a highly coordinated model that supported effective on-site execution. Built In BIM’s expertise in handling multidisciplinary BIM requirements played a pivotal role in streamlining the project’s delivery lifecycle.

get in touch

Let's work together to create the life and business

send a message

Unlock your potential with expert guidance! Schedule a free consultation toward personal and business success.

call us

Call us today for personalized coaching and transformative growth!

email us

Email us now for expert coaching and tailored growth solutions!

inquiry@builtinbim.com

visit us

Visit us for personalized coaching and guidance toward lasting success!

2623 Meadowlark Hills Ct, Spring, Texas 77389