KHPT Hospital

KHPT Hospital

Built In BIM provided advanced LOD 400 MEPF modeling services for KHPT Hospital, a large scale healthcare facility in Europe. The project required high precision Revit models integrated with COBie (Construction-Operations Building information exchange) data to support effective asset management and operational readiness. Our delivery included fully coordinated MEPF systems along with comprehensive data tagging, ensuring compliance, traceability, and construction readiness.

  • Discipline: Mechanical (MEPF)
  • Location: Europe
  • Scope of Work: LOD 400 Revit Modeling with COBie Data Integration – MEPF

Problem

As a critical healthcare infrastructure project, KHPT Hospital faced several technical and operational challenges:

High Detail Requirement:

The hospital project demanded fabrication-level accuracy (LOD 400) for all MEPF components to avoid installation errors.

Cobie Compliance:

Detailed COBie data had to be embedded into the model to support asset lifecycle management, as per the client’s FM (Facility Management) strategy

Strict Quality Standards:

The European client required all BIM deliverables to meet rigorous quality benchmarks and align with healthcare-specific construction standards.

Complex System Coordination:

Multiple MEPF systems had to be modeled and coordinated in a dense utility layout typical of hospital buildings.

Solution

Built In BIM deployed a focused delivery strategy to meet the project’s detailed submission goals:

01

LOD 400 MEPF Modeling:

Developed discipline-specific, fabrication-ready Revit models for mechanical, electrical, plumbing, and fire systems with accurate details, supports, and hangers.

02

Cobie Data Integration:

Mapped and embedded critical COBie parameters—including asset tags, serial numbers, warranties, and maintenance schedules—into all model components.

03

Model Coordination:

Performed clash detection and system routing optimization to ensure a clash-free, installation-ready model.

04

Quality Assurance:

Implemented a robust QA/QC checklist to validate model geometry and data accuracy, ensuring alignment with European BIM standards and healthcare norms..

Gallery

Outcome :

The KHPT Hospital project was delivered with a highly coordinated LOD 400 MEPF model enriched with complete COBie data. Built In BIM’s approach enabled seamless construction execution and provided the client with a valuable digital asset for long-term facility management and maintenance.

get in touch

Let's work together to create the life and business

send a message

Unlock your potential with expert guidance! Schedule a free consultation toward personal and business success.

call us

Call us today for personalized coaching and transformative growth!

email us

Email us now for expert coaching and tailored growth solutions!

inquiry@builtinbim.com

visit us

Visit us for personalized coaching and guidance toward lasting success!

2623 Meadowlark Hills Ct, Spring, Texas 77389