Hoesny Villa

Hoesny Villa

Built In BIM was appointed to develop detailed LOD 300 BIM models for the Hoesny Villa project in the United States. The scope covered both architectural and MEPF elements, with a focus on precise spatial planning, system integration, and support for downstream construction documentation. The objective was to deliver coordinated and constructible models that would serve as the backbone for project execution.

  • Discipline: Architectural (ARCH)
  • Location: United States
  • Scope of Work: LOD 300 Architectural and MEPF Modeling

Problem

The project required a coordinated design approach at LOD 300 to bridge the gap between design intent and construction readiness. The client needed:

Detailed and dimensionally accurate models for both architectural and MEPF components

Seamless integration of building systems to avoid spatial conflicts during construction

A reliable foundation for preparing shop drawings and fabrication documentation

Enhanced model fidelity to reduce on-site decision-making and minimize design interpretation errors

Without proper modeling and coordination, there was a risk of system clashes, field rework, and schedule delays.

Solution

Built In BIM provided a comprehensive modeling solution designed to meet LOD 300 standards:

01

Developed precise architectural and MEPF BIM models in alignment with project specifications and local standards

02

Integrated system layouts for HVAC, plumbing, electrical, and architectural elements to ensure spatial efficiency

03

Verified all elements for constructibility, access, and service coordination

04

Delivered models that were ready for construction documentation and detailing

The team leveraged industry-standard tools and workflows to ensure alignment between all disciplines.

Gallery

Outcome :

The Hoesny Villa project benefited from a high level of coordination and design clarity:

  • Constructible Model: The LOD 300 output served as a ready base for construction and fabrication planning
  • Improved System Coordination: Early detection and resolution of spatial clashes between MEPF and architecture
  • Accurate Detailing: Enabled the client to proceed with documentation and contractor discussions without delay
  • Reduced Risk: Lowered the chance of on-site conflicts, ensuring smoother execution and cost savings

Built In BIM’s disciplined approach empowered the project team with the tools and clarity needed to execute with confidence and precision.

get in touch

Let's work together to create the life and business

send a message

Unlock your potential with expert guidance! Schedule a free consultation toward personal and business success.

call us

Call us today for personalized coaching and transformative growth!

email us

Email us now for expert coaching and tailored growth solutions!

inquiry@builtinbim.com

visit us

Visit us for personalized coaching and guidance toward lasting success!

2623 Meadowlark Hills Ct, Spring, Texas 77389